top of page

Discharge Problem Solving | OCR A-Level Law

Nov 15
20 min read

Updated: 13 hours ago


For Specification H418


OCR A-Level Law | Free Revision Notes


Estimated study time: 55 minutes



Contract discharge problems test whether you can identify why contractual obligations have ended, or whether they have ended at all. These Discharge problem solving A-Level Law revision notes bring together performance, frustration and breach into one methodical approach. OCR requires knowledge of discharge through performance and its exceptions, frustration and its limits, and actual and anticipatory breach. The key exam skill is not writing everything you know about discharge. It is selecting the correct doctrine for each factual issue, applying the relevant authority and reaching a supported conclusion.


Learning Objectives 🎯


By the end of this revision page, you should be able to:

  • Distinguish performance, frustration and breach of contract.

  • Identify whether a scenario concerns actual or anticipatory breach.

  • Select the appropriate rules and exceptions for each contractual issue.

  • Apply relevant legal authority to the precise facts of a scenario.

  • Explain whether contractual obligations have been discharged.

  • Reach clear and supported legal conclusions.


Revision Notes 📚


The three main routes to consider


OCR requires three areas within the topic of discharge:

  1. Performance

  2. Frustration

  3. Breach of contract, including actual and anticipatory breach.


The easiest way to begin a problem is to ask what has happened to the contractual obligation.

Situation

Main area to consider

A party has carried out what was promised

Performance

A party has done most, but not all, of what was promised

Performance and its exceptions

An outside event has affected the contract

Frustration

A party has failed to perform when required

Actual breach

A party indicates before performance is due that they will not perform

Anticipatory breach


These categories can overlap in a scenario, but each factual issue should be analysed separately.


The first question: what exactly did the contract require?


Before selecting any rule, identify the contractual obligation.


Ask:

  • What did the party promise to do?

  • Was there a specific quantity?

  • Was a particular item, place or method specified?

  • Was there a deadline?

  • Was timing a condition?

  • Was the contract one overall obligation or several separate parts?


This avoids jumping into the wrong doctrine.


For example:


"Ravi did not finish the work."

is much less useful than:


"Ravi agreed to install lighting in six rooms for one overall price but completed only four."

The second version immediately raises questions about complete performance, severability, substantial performance and acceptance of partial performance.


Your earlier work on performance [Lesson 231. Performance] and exceptions to complete performance [Lesson 232. Exceptions to complete performance] provides the rules needed for this stage.


Route 1: discharge through performance


The basic rule is that contractual performance must normally be complete and exact.


OCR assessment material identifies:

  • Cutter v Powell for complete performance;

  • Re Moore and Landauer for exact performance.


The starting questions are therefore:

  1. Has everything required been performed?

  2. Does the performance match what the contract required?


If both answers are yes, the relevant contractual obligation can normally be discharged through performance.


Example


Tariq contracts to deliver 300 specified chairs.


He delivers:

  • all 300 chairs;

  • of the specified type;

  • at the required time.


The obligation has been completely and exactly performed.


This is a straightforward case of discharge through performance.


If performance is incomplete, do not stop


A common problem-solving mistake is:


"Performance is incomplete, therefore there is no payment and the analysis is finished."

OCR requires several exceptions to the complete-performance rule.


You should consider whether the facts raise:

  • tender of performance;

  • a severable contract;

  • substantial performance;

  • acceptance of partial performance;

  • delayed performance.


Tender of performance


Where a party properly offers to perform within the required time but the other party refuses to accept that performance, Startup v Macdonald supports the principle that the tender can discharge the performing party's obligation.


Ask:


Did the party actually offer proper performance, but the other contracting party prevent completion?

If yes, tender may be the appropriate rule.


Severable contracts


A contract may be severable, meaning it can be divided into separate obligations.


OCR identifies Taylor v Webb.


When applying this exception, examine:

  • whether each part provides a separate benefit;

  • whether the parts can operate independently;

  • whether a separate price was agreed for each part or one overall price.


OCR's 2024 performance question demonstrates that there may be arguments both ways. Work on separate rooms could be seen as severable because each room provides a separate benefit, but one overall price may point towards a single obligation. A reasoned conclusion either way could receive credit.


Substantial performance


Where most of the contractual work has been properly performed and only a relatively minor amount remains, the doctrine of substantial performance may apply.


The relevant authority is Hoenig v Isaacs.


If substantial performance is established, the party may claim:


$$\text{Contract price} - \text{cost of completing or correcting the remaining work}$$


OCR also identifies Bolton v Mahadeva as a limit, particularly where the remaining problem means there is no real benefit from the contract or the work is dangerous.


Do not treat this as a simple percentage test.


Ask:

  • How significant is the unfinished work?

  • Does the other party still receive substantially the contractual benefit?

  • Is the defect dangerous or fundamental?


Acceptance of partial performance


The other party may agree to accept only part of the promised performance.


OCR identifies Roberts v Havelock.


The crucial factual question is:


Did the other party accept the incomplete performance?

Do not confuse this with substantial performance.


Substantial performance focuses on how much of the contract has been satisfactorily carried out.


Acceptance of partial performance focuses on the conduct of the receiving party.


Delayed performance


Late performance may move the problem from ordinary performance into breach.


OCR identifies three possible approaches:

  • where time is a condition, late performance is a repudiatory breach, illustrated by Astea v Time Computers;

  • a party may give reasonable notice requiring performance within a specified time, illustrated by Rickards v Oppenheim;

  • otherwise, timing may involve an innominate term, where the seriousness of the consequences is assessed under Hong Kong Fir Shipping v Kawasaki Kisen Kaisha.


This demonstrates why performance and breach cannot always be treated as completely separate boxes.


Route 2: frustration


Frustration should be considered where an event affecting the contract, rather than a voluntary failure by one party, causes the problem.


The first stage is to identify a recognised basis for frustration.


OCR assessment materials identify:

  • impossibility of performance, including Nichol and Knight v Ashton Eldridge and Taylor v Caldwell;

  • a radical change of circumstances, where performance would be something very different from what was originally anticipated, including Krell v Henry.


Your earlier work on frustration [Lesson 233. Frustration] covers these grounds in detail.


Impossibility or radical change?


This distinction matters.


Impossibility


Ask:


Can the contractual obligation still actually be performed?

If the answer is no, impossibility may be relevant.


Example:


A contract requires the use of a particular venue, but the venue is destroyed.


Radical change


Ask:


Can performance physically still happen, but would it now amount to something fundamentally different from what the parties anticipated?

Example:


A transport company can still take equipment to a location, but the festival for which the equipment was being transported has been cancelled.


OCR examiners specifically identified confusion between these two ideas in the 2023 examination. Candidates who described the cancelled-festival contract as impossible received no credit for that line because delivery was still physically possible. The correct issue was radical change of circumstances.


After finding a possible ground, test the limits


Never conclude:


"A frustrating event occurred, so the contract is frustrated."

You must next ask whether frustration is excluded by a limit.


OCR requires the limits to frustration.


Important limits identified in OCR assessment materials include:

  • performance is still possible but more difficult or expensive;

  • the change is not sufficiently radical;

  • the event was anticipated;

  • the alleged frustration is self-induced.


More difficult or expensive performance


Tsakiroglou v Noblee Thorl supports the principle that a contract is not frustrated merely because performance becomes more difficult or expensive.


For example, if a normal transport route closes but another route remains available at much greater cost, frustration may fail.


OCR's sample assessment used this distinction. A contract remained performable by boat even though that method cost three times more than air transport. The increase in cost did not itself frustrate the agreement.


Insufficiently radical change


OCR identifies Herne Bay v Hutton and Davis Contractors v Fareham UDC when considering whether a change is sufficiently radical.


Ask:


Is the party still essentially being required to perform the contract originally agreed?

If so, frustration may fail.


Anticipated events


A party may be unable to rely on frustration where the supposedly frustrating event was already anticipated.


OCR identifies Amalgamated Investments v John Walker.


Self-induced frustration


A party cannot normally rely on a situation they have created through their own fault or choice.


Relevant OCR authorities include:

  • Maritime National v Ocean Trawlers

  • Super Servant 2.


A particularly useful question is:


Did the event itself make performance unavailable, or did the party choose not to use another available method of performance?

In the 2023 OCR examination, a transport company had two suitable lorries. One became unavailable, but the other had been allocated to other contracts. OCR treated the party's own choice as important to the issue of self-induced frustration.


If frustration applies, consider the financial consequences


Once you have concluded that the contract is frustrated, the Law Reform (Frustrated Contracts) Act 1943 may need to be applied.


OCR identifies:

  • s1(2), money paid before the frustrating event may be reclaimed, subject to just expenses;

  • s1(3), a party may have to account for a valuable benefit obtained.


This is covered fully in limits and consequences of frustration [Lesson 234. Limits and consequences of frustration].


Keep the order clear:


ground for frustration → limits → conclusion → financial consequences


Do not apply the 1943 Act to a contract that is not frustrated.


Route 3: breach of contract


If there is no valid frustration and one party simply fails to perform, the issue may be breach of contract.


This is an important problem-solving link.


OCR's sample mark scheme made the point directly: if a contract was not frustrated because performance remained possible, failure to carry out the agreement would amount to breach.


This prevents a weak answer such as:


"Frustration fails, therefore nothing happens."

Instead:


"Frustration is unlikely because performance remains possible. If the party nevertheless refuses to perform, breach of contract should be considered."

Actual breach


An actual breach occurs when a party fails to comply with a contractual obligation when performance is due or during performance.


You then need to determine whether the breach is:

  • repudiatory; or

  • non-repudiatory.


The classification of the relevant term matters.


Your earlier work on actual breach of contract [Lesson 235. Actual breach of contract] provides the detailed rules.


Breach of a condition


Breach of a condition is repudiatory.


The innocent party may therefore treat the breach as sufficiently serious to justify termination, alongside any appropriate claim in damages.


For example, OCR identifies Astea v Time Computers for a contract where timely performance is a condition. Late performance then amounts to repudiatory breach.


Breach of a warranty


Breach of a warranty is non-repudiatory.


The innocent party may seek damages where appropriate, but cannot terminate the whole contract merely because of that breach.


Breach of an innominate term


For an innominate term, apply the breach-based approach.


Under Hong Kong Fir Shipping v Kawasaki Kisen Kaisha, the consequences of the breach determine whether it is sufficiently serious to be repudiatory.


Ask:


How seriously has the breach affected the contractual benefit expected by the innocent party?

The same contractual term can therefore produce a different result depending on the consequences of the particular breach.


Anticipatory breach


A breach may arise before performance is due.


OCR identifies Hochster v De La Tour for the rule that where a party indicates that they are not going to perform, the other party may repudiate and take action immediately.


This is developed in anticipatory breach [Lesson 236. Anticipatory breach].


Check whether the contractual date has arrived


This is the quickest diagnostic test:


Performance date has passed


Consider actual breach.


Performance date has not passed


Ask whether there is sufficient evidence that future performance will not occur.


This may be:

  • an express refusal to perform; or

  • circumstances making timely performance impossible.


OCR's 2024 performance question illustrates the distinction. If Ryan could still have completed the work by the stated date, there was no right to terminate merely because work had not yet begun. If completing it in time had already become impossible, anticipatory breach could be established and the hotel did not need to wait until the deadline.


Distinguishing performance, frustration and breach


The most important problem-solving skill is identifying the cause of the contractual issue.

Question

If yes, consider

Has the party done everything required?

Complete performance

Has almost everything been done?

Substantial performance

Can the contract be divided into separate obligations?

Severable contract

Did the other party accept incomplete work?

Partial performance

Did the party offer proper performance but the other side refuse it?

Tender of performance

Has an external event made performance impossible?

Frustration

Is performance still possible but fundamentally different?

Radical change and frustration

Is performance merely harder or more expensive?

Frustration likely fails

Did the party cause the alleged frustration themselves?

Self-induced frustration

Has the party failed to perform when required?

Actual breach

Has the party indicated in advance that they will not perform?

Anticipatory breach

Has a condition been broken?

Repudiatory breach

Has a warranty been broken?

Non-repudiatory breach

Has an innominate term been broken?

Analyse consequences


The crucial distinction: frustration or breach?


This is especially important.


Frustration


The contractual problem results from a qualifying change affecting performance.


Breach


The problem results from a party failing or refusing to perform as legally required.


A party cannot normally turn a bad commercial bargain into frustration simply because performance is inconvenient or expensive.


Example


North Ltd agrees to deliver goods. Its preferred road later closes.


Another route remains available, but costs twice as much.


North Ltd refuses to deliver.


The analysis is:

  1. The contract is still possible to perform.

  2. Extra expense does not itself establish frustration.

  3. The frustration argument is therefore weak.

  4. North Ltd remains contractually obliged to perform.

  5. If North Ltd refuses, the problem becomes one of breach.


That movement from one doctrine to another is exactly what strong problem solving requires.


The crucial distinction: incomplete performance or breach?


Incomplete work may raise both areas.


Suppose an electrician completes nearly all of a contract but leaves one small item unfinished.


Start with:


Has there been complete and exact performance?


If not, apply the relevant performance exception before immediately classifying the situation as breach.


OCR's 2024 question rewarded students who considered substantial performance where only a small part of the work remained.


By contrast, if a significant obligation has not been completed and no performance exception applies, breach becomes much more important.


The crucial distinction: delayed performance or anticipatory breach?


Look at the contractual date.


Suppose work is due by 1 October.


On 2 October, the work has not been completed


This is potentially an actual breach.


On 1 September, the work has not started but can still easily be finished on time


Anticipatory breach is unlikely merely because work has not started.


On 29 September, the work has not started and necessarily takes three weeks


Timely performance has become impossible. This can raise anticipatory breach before 1 October.


OCR specifically credited this alternative approach in 2024.


A complete decision-making method


Use this sequence when faced with an unfamiliar discharge scenario.


Step 1: Separate the contractual relationships


If the scenario contains three contracts, treat them as three short problems.


Do not write one large block of discharge law and then apply it at the end.


Step 2: Identify the precise contractual obligation


State:

  • what was promised;

  • when it had to be performed;

  • whether a specific method or subject matter was required;

  • whether the contract is potentially divisible.


Step 3: Identify what happened


Ask whether the issue is:

  • successful performance;

  • incomplete performance;

  • an outside event;

  • failure to perform;

  • refusal to perform;

  • delay;

  • advance indication of non-performance.


Step 4: Choose the strongest legal route


Do not apply every possible discharge doctrine.


Choose the rule that matches the facts.


Step 5: State the relevant legal principle and authority


For example:


"Performance must normally be complete, illustrated by Cutter v Powell."

or:


"A contract may be frustrated where performance has become impossible, illustrated by Taylor v Caldwell."

Step 6: Apply the facts immediately


Do not leave all application until the end.


Explain why this particular fact satisfies or fails the rule.


Step 7: Consider any exception or limit


For performance:

  • substantial performance?

  • severability?

  • partial performance?

  • tender?


For frustration:

  • merely more expensive?

  • insufficiently radical?

  • anticipated?

  • self-induced?


For breach:

  • condition, warranty or innominate term?

  • actual or anticipatory?


Step 8: Reach a conclusion for that issue


Use a conclusion such as:


"The contract is therefore likely to be frustrated."

or:


"The substantial-performance exception is likely to apply, so the contractor may claim the contract price subject to the cost of completing the outstanding work."

or:


"This is likely to be a repudiatory breach, so the innocent party may treat the contract as terminated."

Step 9: Move to the next contractual issue


Do not wait until the end of a 20-mark answer to give one general conclusion.


A model problem-solving framework


A useful paragraph pattern is:


Rule


State the precise legal rule.


Authority


Give a relevant case or statute.


Application


Apply individual facts to individual elements of the rule.


Alternative


Where the facts genuinely support another interpretation, explain it.


Conclusion


Reach the strongest supported result.


For example:


Performance must normally be complete, as illustrated by Cutter v Powell. Here, Lucas has completed all the contracted work except one small cupboard light. His performance is therefore not literally complete. However, the unfinished light represents only a minor part of the whole electrical contract and does not appear to deprive the hotel of substantially the contractual benefit. Under Hoenig v Isaacs, this is likely to amount to substantial performance. Lucas should therefore be able to claim the contract price subject to the cost of completing the light.

Notice that the case authority supports the rule, while most of the paragraph is spent applying the facts.


Where two arguments are possible


OCR does not always expect one predetermined conclusion.


The 2024 performance question permitted different conclusions on severability where students justified them through the facts.


A strong answer might say:


"Each room gives the hotel an independent benefit, supporting severability under Taylor v Webb. However, one overall price was agreed rather than a separate price for each room, which points towards one indivisible obligation. On balance..."

This is much stronger than simply writing:


"The contract is severable."

The conclusion should emerge from the legal reasoning.


Do not confuse discharge with remedies


Discharge asks:


What has happened to the contractual obligations?

Remedies ask:


What legal response is available after a breach or other event?

Detailed remedies are studied next in compensatory damages [Lesson 238. Compensatory damages].


The OCR examiner reports have warned against confusing topics and using legal terminology from one area to answer a different question.


For a discharge problem, focus first on identifying whether the contract has been:

  • performed;

  • frustrated;

  • breached;

  • or remains in force.


Key Words 🔑

Key word

Student-friendly definition

How it may be used in an exam

Discharge

The ending of contractual obligations.

State whether and why the parties are released from contractual duties.

Performance

Carrying out the obligations required by the contract.

Decide whether duties have been completely and exactly performed or an exception applies.

Frustration

Discharge caused by a qualifying change affecting contractual performance.

Apply a ground for frustration and then test the relevant limits.

Repudiatory breach

A breach sufficiently serious to allow the innocent party to treat the contract as terminated.

Decide whether breach of a condition or serious innominate term permits termination.

Anticipatory breach

An indication before performance is due that a party will not perform the contract.

Determine whether the innocent party may act before the contractual deadline.


Hints from the Examiner Reports 💡


Examiner hint: Be methodical. OCR's 2024 report found a clear difference between candidates who worked through each legal stage and those who jumped straight to the answer. AO2 marks depend on analysing how the facts satisfy the legal rules, not merely stating the final outcome.
Examiner hint: Treat a multi-part scenario as several short legal problems. OCR's 2023 report described this as the most effective structure because it helps students select the relevant rule and avoids missing issues or including irrelevant law.
Examiner hint: Do not write all the law you know before applying it. OCR has repeatedly warned that this encourages irrelevant material. State the legal principle needed for the particular issue, then apply it straight away.
Examiner hint: Case names alone are not enough. OCR's 2024 report emphasised that a case should be used to explain a legal point, and that authorities should be relevant to the issue raised by the scenario.
Examiner hint: Distinguish impossibility from radical change carefully. OCR's 2023 report identified this as a recurring weakness in frustration answers. Ask whether physical performance remains possible before choosing the ground.
Examiner hint: Reach a clear conclusion on every separate contractual issue. The 2025 examiner report notes that clearly defined conclusions following accurate law and application help candidates access the higher mark bands.

Common Mistakes ⚠️


Mistake: Applying all three methods of discharge to every issue


Why this is incorrect: A scenario normally contains factual clues pointing towards a particular legal doctrine. Writing performance, frustration and breach rules indiscriminately wastes time and risks including irrelevant law.


How to improve: Identify what happened first, then select the doctrine that best explains it.


Mistake: Concluding that incomplete performance automatically means breach


Why this is incorrect: OCR requires several exceptions to complete performance, including substantial performance, severable contracts and acceptance of partial performance.


How to improve: Apply the basic complete-performance rule, then test relevant exceptions before moving to breach.


Mistake: Concluding that frustration applies because a contract is now expensive


Why this is incorrect: Under the principle illustrated by Tsakiroglou v Noblee Thorl, increased difficulty or cost does not itself frustrate a contract if performance remains possible.


How to improve: Ask whether the contractual obligation can still be carried out.


Mistake: Calling commercially pointless performance impossible


Why this is incorrect: Physical impossibility and radical change are different grounds. OCR examiners specifically identified confusion between them.


How to improve: Ask whether performance can still physically occur. If yes, consider whether the contract has instead become fundamentally different.


Mistake: Stopping after deciding that frustration fails


Why this is incorrect: If the contract is not frustrated, the contractual obligation may remain binding. Refusal to perform may therefore amount to breach.


How to improve: Write:


"Frustration is unlikely. The contractual duty therefore remains, and failure to perform may amount to breach."

Mistake: Ignoring whether the breach is repudiatory


Why this is incorrect: Not every breach allows termination.


How to improve: Identify whether the broken term is a condition, warranty or innominate term and classify the breach accordingly.


Mistake: Treating failure to start work as automatic anticipatory breach


Why this is incorrect: The party may still be able to complete the contract by the agreed deadline.


How to improve: Check whether timely performance remains possible before applying Hochster v De La Tour.


Mistake: Giving one conclusion at the end of a long answer


Why this is incorrect:Each contractual relationship may produce a different legal result.


How to improve:Reach a separate conclusion immediately after analysing each issue.


Exam-Style Questions ✍️


Question 1


Identify the three principal areas of contractual discharge required by OCR. [3 marks]


Question 2


Explain one difference between frustration and breach of contract. [3 marks]


Question 3


Sanjay agrees to install ten specified lights for a fixed contract price. He correctly installs all ten lights.


Explain whether Sanjay's contractual obligation has been discharged. [4 marks]


Question 4


Holly agrees to decorate an office for a fixed price. She completes all the work except one small decorative panel. The panel does not affect the use or safety of the office and would cost very little to complete.


Advise whether the contract may be discharged through substantial performance. [6 marks]


Question 5


Metro Ltd agrees to transport equipment to a customer. Its usual route later closes, but a longer route remains available. The alternative route will cost Metro Ltd twice as much. Metro Ltd refuses to deliver.


Advise whether Metro Ltd can rely on frustration and explain the significance if frustration fails. [8 marks]


Question 6


Apex Events contracts with SoundCo to install equipment by 1 September. The contract expressly states that completion by 1 September is a condition. SoundCo completes the installation on 8 September.


Advise Apex Events on the nature of the breach. [8 marks]


Question 7


Consider the following separate contracts:

  • Priya contracts to hire a particular hall for a conference. Before the conference, the hall is destroyed.

  • Malik contracts to decorate six rooms for one overall price. He completes four rooms.

  • Ella must deliver equipment on 20 July. On 1 July she tells the buyer that she will not make the delivery.


Identify and apply the most appropriate discharge rules to each contract. [12 marks]


Question 8


Oak Hotels has four separate contracts.


Contract A: Nico agrees to rewire the hotel's restaurant. He completes all the work except one small cupboard light. The unfinished light does not affect safety and would cost £80 to complete.


Contract B: MoveCo agrees to transport specialist equipment to a music festival. Before the journey, the festival is cancelled. MoveCo could still make the journey exactly as agreed, but there would no longer be an event at which the equipment could be used.


Contract C: SupplyCo agrees to deliver furniture to Oak Hotels. Its preferred route later closes. Another route is available but would cost three times as much. SupplyCo refuses to make the delivery.


Contract D: StageTech agrees to install a stage system by 30 June. On 27 June no work has begun, and the installation necessarily takes at least ten days to complete.


Advise Oak Hotels and the other parties whether each contractual obligation has been discharged and identify any breach that may have occurred. [20 marks]


Answers and Mark Scheme


Question 1 [3 marks]


Award one mark for each of:

  • performance;

  • frustration;

  • breach of contract, including actual and anticipatory breach.


Question 2 [3 marks]


Indicative content:

  • Frustration concerns a qualifying change affecting the contract.

  • Breach concerns a party failing or refusing to comply with contractual obligations.

  • A valid frustrating event may discharge the contract, whereas breach requires consideration of whether the breach is repudiatory or non-repudiatory.


Credit any accurate distinction supported by explanation.


Question 3 [4 marks]


Indicative content:

  • The contract required Sanjay to install ten specified lights.

  • He installed all ten, so performance is complete.

  • They are the specified lights, so performance is exact.

  • Under the basic rules of performance illustrated by Cutter v Powell and Re Moore and Landauer, the relevant contractual obligation is discharged through performance.


Question 4 [6 marks]


Indicative content:

  • Holly has not literally completed every element of the contract.

  • The basic rule of complete performance is therefore not satisfied.

  • However, the substantial-performance exception must be considered.

  • Hoenig v Isaacs supports a claim for the contract price subject to the cost of completing outstanding minor work.

  • The missing panel is minor, inexpensive and does not remove the benefit or make the result dangerous.

  • Bolton v Mahadeva is therefore unlikely to prevent the exception applying.

  • Holly is likely to have substantially performed and may claim the contract price subject to the cost of completing the panel.


Question 5 [8 marks]


Indicative content:

  • Metro's contractual obligation remains physically possible.

  • An alternative route remains available.

  • The main change is that the contract has become more expensive.

  • Tsakiroglou v Noblee Thorl supports the rule that additional difficulty or expense is insufficient by itself to frustrate the contract.

  • The performance required is not fundamentally different merely because the route costs more.

  • Frustration is therefore unlikely.

  • Because the contract remains binding, Metro remains obliged to deliver.

  • If Metro refuses to perform, its conduct may amount to breach of contract.


Question 6 [8 marks]


Indicative content:

  • SoundCo was required to complete installation by 1 September.

  • Completion occurred after that date.

  • The timing requirement is expressly a condition.

  • OCR identifies Astea v Time Computers for the rule that late performance where time is a condition amounts to repudiatory breach.

  • The term-based approach therefore applies.

  • SoundCo has committed a repudiatory breach.

  • Apex may treat the breach as sufficiently serious to terminate.

  • Damages may also be relevant, although their detailed calculation belongs to the remedies topic.


Question 7 [12 marks]


Indicative content:


Priya and the hall

  • The contract concerns a particular hall.

  • That hall has been destroyed.

  • Performance involving that hall is impossible.

  • Taylor v Caldwell supports frustration through impossibility.

  • The contract is likely to be frustrated, subject to any relevant limits.


Malik and the rooms

  • Malik has not completed the whole contract.

  • The basic complete-performance rule is therefore not satisfied.

  • Four rooms out of six is unlikely simply to be assumed to amount to substantial performance.

  • The contract may potentially be severable under Taylor v Webb because each completed room provides an independent benefit.

  • However, one overall price was agreed, which may indicate one overall contractual obligation.

  • A conclusion either way should be justified using these competing facts.

  • There is no evidence that partial performance has been accepted.


Ella and the equipment

  • Performance is not due until 20 July.

  • Ella expressly states on 1 July that she will not deliver.

  • This raises anticipatory breach.

  • Under Hochster v De La Tour, the innocent party does not have to wait until the performance date and may act immediately.


Question 8 [20 marks]


Indicative content:


Contract A: Nico

  • Nico has not completely performed because one light remains unfinished.

  • The basic rule in Cutter v Powell would therefore initially prevent a straightforward claim based on complete performance.

  • However, substantial performance should be considered under Hoenig v Isaacs.

  • Only one small cupboard light remains.

  • It costs only £80 to complete.

  • It does not affect safety or the useful benefit received by Oak Hotels.

  • The limitation in Bolton v Mahadeva is therefore unlikely to apply.

  • Nico is likely to have substantially performed.

  • He may claim the contract price subject to the £80 cost of completing the outstanding work.


Contract B: MoveCo

  • MoveCo can still physically perform the transport contract.

  • The issue is therefore not impossibility.

  • However, the festival forming the basis of the agreement has been cancelled.

  • Transporting the equipment to a festival that no longer exists may amount to a radical change of circumstances.

  • Krell v Henry supports frustration where performance has become fundamentally different from what was originally anticipated.

  • The contract is likely to be frustrated if the cancelled festival formed the basis of the agreement.

  • Oak Hotels and MoveCo would then need to consider the financial consequences under the Law Reform (Frustrated Contracts) Act 1943 if money or valuable benefits had already passed.


Contract C: SupplyCo

  • The preferred route is unavailable.

  • An alternative route remains available.

  • Performance is therefore still possible.

  • The main effect is increased expense.

  • Tsakiroglou v Noblee Thorl supports the rule that a contract is not frustrated merely because performance becomes more difficult or expensive.

  • Frustration is unlikely.

  • SupplyCo therefore remains contractually obliged to perform.

  • If it refuses to deliver, it may commit an actual breach of contract.

  • The precise consequences would depend on the relevant contractual term and whether the breach is repudiatory or non-repudiatory.


Contract D: StageTech

  • Performance is due on 30 June.

  • On 27 June, the contractual date has not yet arrived.

  • However, StageTech has not begun.

  • The installation necessarily takes ten days, while only three days remain.

  • Timely performance has therefore become impossible.

  • This raises anticipatory breach.

  • Under Hochster v De La Tour, Oak Hotels does not have to wait until 30 June before responding if StageTech has clearly indicated through the circumstances that timely performance cannot occur.

  • Oak Hotels may therefore treat the conduct as anticipatory breach and act immediately.


For the highest level, answers should select a different legal route where appropriate for each contract, explain relevant legal authority, apply the precise facts, consider exceptions or limits before reaching conclusions and clearly distinguish frustration from breach.

Recent Posts

See All

Comments


bottom of page